Data Center Construction Site Foreman (Querétaro, Mexico)

LambdaDallas, TX - Data Center, Querétaro, Mexico - Data Center, USAJob.bopublicada em 04/09/2026
Obrigatório:Lead

Lambda, The Superintelligence Cloud, is a leader in AI cloud infrastructure serving tens of thousands of customers. Our customers range from AI researchers to enterprises and hyperscalers. Lambda's mission is to make compute as ubiquitous as electricity and give everyone the power of superintelligence. One person, one GPU.

If you'd like to build the world's best AI cloud, join us.

Travel: 75% , Sustained on-site presence required at active data center construction and fit-out sites.

What You’ll Do

As a Construction Onsite Foreman, you are Lambda’s eyes, ears, and hands in the field. You will hold daily on-site command of colocation white space fit-outs, high-density compute expansions, and infrastructure upgrades, working under the Data Center Implementation Manager and alongside the Data Center Implementation Project Manager to turn drawings and schedules into installed, energized, and accepted capacity.

You will direct and coordinate trade crews and vendor teams on the floor, sequence work across electrical, mechanical, low voltage, and network scopes, enforce safety and quality standards, and keep material and equipment flowing to the point of install. You will catch field conflicts before they become schedule impacts, escalate what cannot be solved at the site level, and own the daily record of what actually happened on your job.

Key Responsibilities

  • Daily Field Supervision:
  • Serve as Lambda’s on-site lead for assigned data center projects. Direct daily activity across MEP contractors, low voltage and network installers, rack and integration crews, and OEM field service teams. Run daily huddles, set the day’s priorities, and confirm each crew knows its scope, sequence, and constraints.
  • Fit-Out & Installation Oversight:
  • Oversee physical execution of white space fit-out work including rack and cabinet setting, containment, busway and branch circuit distribution, rPDU installation, cable tray, structured cabling, liquid cooling and CDU tie-ins, and airflow management. Verify installations match approved drawings and Lambda standards before work is covered or energized.
  • Safety Leadership:
  • Enforce site safety requirements, energized work permits, LOTO procedures, hot work permits, and PPE compliance. Conduct daily safety walks, stop unsafe work immediately, and lead incident and near-miss reporting with the data center provider and general contractor.
  • Quality Control & Inspections:
  • Perform in-progress and pre-cover inspections, torque and terminations checks, labeling verification, and workmanship reviews. Build and drive punch lists to closure, rejecting non-conforming work and confirming corrections in the field.
  • Trade & Vendor Coordination:
  • Deconflict overlapping trade work, sequence access to shared space and shafts, and coordinate outage and switching windows with the data center provider. Escort and manage vendor access, badging, tool and material handling, and site rules compliance.
  • OFCI Material Management:
  • Receive, inspect, stage, and secure OFCI (Owner-Furnished, Contractor-Installed) equipment. Verify shipments against packing lists and submittals, document damage and shortages immediately, manage laydown and storage areas, and confirm material readiness ahead of each install window.
  • Schedule Support & Lookaheads:
  • Own the three-week lookahead in the field. Track daily progress against the construction schedule, flag manpower and material gaps early, and provide the Implementation Project Manager with accurate percent-complete and constraint data.
  • Field Documentation & Reporting:
  • Produce daily field reports covering manpower counts, work completed, deliveries, delays, safety observations, and photo documentation. Maintain redline markups, RFI and field observation logs, and as-built notes for turnover.
  • Issue Resolution & Escalation:
  • Resolve constructability conflicts and field questions at the site level where possible. Generate clear RFIs with photos and drawing references when a design or scope decision is needed, and escalate cost, schedule, or safety impacts without delay.
  • Commissioning & Turnover Support:
  • Support pre-functional checks, Level 1 through Level 4 commissioning activities, and integrated systems testing. Coordinate contractor availability for scripts, witness testing where directed, and drive open-item closure through final acceptance and handoff to Data Center Operations.
  • Cross-functional Alignment:
  • Work closely with Network Engineering, Data Center Operations, HPC, Supply Chain, and Technical Project Management so that deployment, cabling, and hardware install activities land in the right sequence and space is turned over ready for GPU deployment.

You

  • Come from the trades, with a working foreman’s command of how mission-critical space actually gets built, installed, and energized.
  • Experienced running crews and vendors in live and occupied data center environments where uptime and adjacency risk are unforgiving.
  • Fluent in reading and marking up construction drawings, single lines, riser diagrams, submittals, and installation details.
  • Sets a visible safety standard and is comfortable stopping work and holding contractors to it, including under schedule pressure.
  • Detail-driven on workmanship, labeling, torque, containment, and cable management, with a low tolerance for shortcuts that create operational debt.
  • Organized in the field with materials, tools, laydown, and deliveries, and disciplined about documenting what happened each day.
  • Direct and clear communicator who can brief a project manager, challenge a contractor, and write a usable daily report.
  • Comfortable working with limited oversight, making sound calls on site, and knowing precisely when to escalate.
  • Proficient with mobile field tools, photo documentation, and punch list and project tracking platforms.
  • Willing to travel to project sites and to work off-hours, nights, or weekends when critical activities or outage windows require it.

Top Five Requirements

  1. Hands-On Data Center or Mission-Critical Field Experience:

- Proven record supervising construction, fit-out, or infrastructure installation work in data centers or comparable mission-critical facilities.

  1. Crew & Trade Supervision:

- Demonstrated ability to direct and sequence multiple trades and vendors on a live site, holding daily accountability for scope, pace, and workmanship.

  1. MEP & Low Voltage Installation Knowledge:

- Practical command of electrical distribution, mechanical and cooling systems, containment, and structured cabling, with the ability to read drawings and catch field conflicts.

  1. Safety Ownership:

- Consistent enforcement of site safety, LOTO, energized work, and permitting requirements, with the authority and willingness to stop unsafe work.

  1. Field Documentation & Reporting Discipline:

- Reliable daily reporting, photo documentation, redlines, punch list management, and clear escalation to project management.

Qualifications

  • High school diploma or equivalent required. Completed trade apprenticeship, journeyman license, technical certification, or associate degree in a construction or engineering discipline strongly preferred.
  • 5+ years of construction field experience, including 2+ years in a foreman, lead, or superintendent capacity.
  • Direct experience with data center white space fit-out, critical facility construction, or comparable industrial and mission-critical installation work.
  • Working knowledge of electrical, mechanical, and low voltage systems and installation practices, including power distribution, cooling, containment, and cabling.
  • Ability to read and interpret construction drawings, specifications, submittals, and installation instructions, and to produce accurate redlines.
  • OSHA 30 certification required or obtained within 90 days of hire. NFPA 70E familiarity preferred. First Aid and CPR certification a plus.
  • Familiarity with commissioning processes, pre-functional checklists, and punch list closeout.
  • Comfortable with field reporting tools and project platforms (e.g., Procore, Smartsheet, MS Project, Monday.com http://Monday.com) and with mobile photo documentation.
  • Able to lift, climb, work at height, and remain on foot in active construction environments for extended periods.
  • Willingness to travel to and work within active construction sites (~75%), including off-hours and weekend work during critical activities.
  • Committed to safety, quality, and continuous improvement in field execution practices.

Salary Range Information

The annual salary range for this position has been set based on market data and other factors. However, a salary higher or lower than this range may be appropriate for a candidate whose qualifications differ meaningfully from those listed in the job description.

About Lambda

  • Founded in 2012, with 500+ employees, and growing fast
  • Our investors notably include TWG Global, US Innovative Technology Fund (USIT), Andra Capital, SGW, Andrej Karpathy, ARK Invest, Fincadia Advisors, G Squared, In-Q-Tel (IQT), KHK & Partners, NVIDIA, Pegatron, Supermicro, Wistron, Wiwynn, Gradient Ventures, Mercato Partners, SVB, 1517, and Crescent Cove
  • We have research papers accepted at top machine learning and graphics conferences, including NeurIPS, ICCV, SIGGRAPH, and TOG
  • We offer generous cash & equity compensation
  • Health, dental, and vision coverage for you and your dependents
  • Wellness and commuter stipends for select roles
  • 401k Plan with 2% company match (USA employees)
  • Flexible paid time off plan that we all actually use

Equal Opportunity Employer

Lambda is an Equal Opportunity employer. Applicants are considered without regard to race, color, religion, creed, national origin, age, sex, gender, marital status, sexual orientation and identity, genetic information, veteran status, citizenship, or any other factors prohibited by local, state, or federal law.