Commissioning Supervisor

STI ADVANCE (S) PTE. LTD.Singapore, Yishunmycareersfutureopublikowano 05.11.2026
Wymagane:QA/TestLead

Key Responsibilities

A. Daily Commissioning Supervision and Execution

  • Supervise and coordinate daily pre-commissioning, commissioning, functional testing, and equipment start-up activities at assigned project sites.
  • Lead commissioning technicians and site personnel in executing assigned activities according to approved work procedures, commissioning schedules, and project requirements.
  • Allocate daily tasks and monitor manpower deployment, work progress, productivity, and completion of assigned activities.
  • Conduct daily work briefings and ensure that technicians understand assigned tasks, technical requirements, safety precautions, and expected deliverables.
  • Verify that equipment, systems, work areas, and supporting utilities are ready before commencing commissioning activities.
  • Coordinate with Commissioning Engineers to establish daily work priorities, testing sequences, and technical requirements.
  • Monitor the progress of commissioning activities and promptly report delays, technical issues, resource constraints, and outstanding works.
  • Ensure commissioning activities are carried out systematically to achieve project milestones without compromising safety or equipment quality.

B. Equipment Inspection, Testing and Commissioning

  • Supervise and participate in the inspection, testing, and commissioning of chemical dispensing equipment, chemical delivery systems, process piping, pumps, valves, instrumentation, and associated electrical and automation systems.
  • Coordinate and oversee pre-commissioning activities, including piping integrity checks, leak testing, flushing, cleaning, instrument verification, and equipment inspection.
  • Ensure technicians follow approved testing procedures and correctly use measuring instruments, tools, and testing equipment.
  • Assist Commissioning Engineers in conducting system functional tests, operational checks, and equipment performance verification.
  • Support PLC/HMI-related functional testing, including I/O checks, equipment alarms, interlocks, emergency shutdown functions, and safety system verification.
  • Monitor equipment operating conditions, pressure, flow rates, and other relevant parameters during commissioning activities.
  • Identify equipment abnormalities, installation defects, and operational issues, and coordinate troubleshooting with Commissioning Engineers and relevant technical teams.
  • Verify that rectification works are completed correctly before equipment or systems are retested.
  • Ensure all testing activities comply with approved engineering drawings, P&IDs, technical specifications, and customer requirements.

C. Site Coordination and Work Management

  • Coordinate daily work activities with Commissioning Engineers, construction supervisors, installation contractors, vendors, and customer site representatives.
  • Liaise with construction and installation teams to verify mechanical completion and equipment readiness for commissioning.
  • Support site walkdowns, equipment inspections, and readiness assessments before commencement of testing activities.
  • Ensure that required tools, testing instruments, consumables, spare parts, technical documentation, and other resources are available before work begins.
  • Coordinate work arrangements, access requirements, and testing schedules to minimize interruptions and conflicts with other site activities.
  • Monitor completion of assigned work scopes and ensure timely follow-up on outstanding installation or commissioning issues.
  • Assist with the coordination of vendor specialists and external technical support during equipment testing and troubleshooting.
  • Escalate unresolved technical, safety, or scheduling issues to the Commissioning Engineer or Commissioning Manager.

D. Quality Control, Inspection and Punch-List Management

  • Supervise commissioning work to ensure compliance with approved procedures, installation requirements, quality standards, and customer specifications.
  • Conduct site inspections and system walkdowns to identify incomplete installations, equipment defects, and commissioning-related deficiencies.
  • Record, monitor, and follow up on punch-list items, ensuring that assigned rectification works are completed within agreed timelines.
  • Verify workmanship, installation quality, equipment cleanliness, and system readiness before functional testing.
  • Assist Commissioning Engineers and QA/QC personnel in carrying out inspection and testing activities.
  • Support Factory Acceptance Tests (FAT), Site Acceptance Tests (SAT), and customer inspection activities, where applicable.
  • Ensure that commissioned equipment meets specified operational requirements and that outstanding deficiencies are reported and addressed.
  • Maintain proper housekeeping and ensure that equipment and work areas meet applicable cleanliness and contamination control requirements.

E. Environmental, Health and Safety (EHS) Compliance

  • Enforce compliance with company EHS policies, customer site safety requirements, and applicable workplace safety regulations.
  • Conduct daily toolbox meetings and pre-work safety briefings to communicate work hazards, preventive measures, and safe operating procedures.
  • Ensure commissioning activities are performed under approved Permit-to-Work (PTW), Lockout/Tagout (LOTO), Job Safety Analysis (JSA), and risk assessment requirements, where applicable.
  • Verify that commissioning technicians use appropriate Personal Protective Equipment (PPE), approved tools, and safe work practices.
  • Superviseactivities involving hazardous chemicals, pressurized equipment, electrical systems, and other commissioning-related hazards.
  • Ensure safety precautions and required authorizations are in place before testing, equipment energization, chemical introduction, or system start-up.
  • Support verification of equipment safety features, including emergency shutdown functions, chemical leak detection, alarms, and safety interlocks.
  • Identify unsafe conditions, unsafe acts, and potential hazards, and take immediate action to stop unsafe work and report incidents or near misses.
  • Promote a strong safety culture and ensure that technicians comply with site-specific safety requirements and procedures.

F. Commissioning Documentation and Progress Reporting

  • Maintain accurate daily commissioning records, work progress reports, inspection checklists, testing records, and equipment verification documentation.
  • Ensure technicians complete assigned commissioning checklists, test records, and other required documentation correctly and promptly.
  • Record and report equipment abnormalities, technical issues, test failures, and outstanding commissioning activities.
  • Update daily work progress, manpower utilization, punch-list registers, and commissioning activity trackers.
  • Assist Commissioning Engineers in compiling test results, inspection records, and supporting documentation for customer review and acceptance.
  • Verify that completed commissioning activities are properly recorded and submitted for review and approval.
  • Provide regular updates to Commissioning Engineers and the Commissioning Manager onsite progress, technical concerns, safety matters, and outstanding works.

G. System Start-Up, Acceptance and Handover Support

  • Supervise technicians during system start-up, operational verification, functional testing, and equipment performance checks.
  • Support Commissioning Engineers during customer inspections, system demonstrations, and acceptance testing.
  • Coordinate technicians to complete outstanding rectification works and punch-list closure before final system acceptance.
  • Assist in verifying equipment readiness and completeness of commissioning activities prior to system handover.
  • Provide technical and operational support to customer operations and maintenance teams during initial equipment start-up and stabilization.
  • Assist in basic equipment familiarization and operational training activities, where required.
  • Support post-commissioning troubleshooting and warranty-related site activities as assigned.

H. Team Supervision and Continuous Improvement

  • Supervise, guide, and mentor commissioning technicians to ensure safe and effective execution of assigned tasks.
  • Monitor technician performance, workmanship, productivity, and compliance with site procedures.
  • Provide hands-on technical guidance during equipment inspection, testing, troubleshooting, and commissioning activities.
  • Identifytraining needs and recommend improvements to technical competency, work practices, and safety awareness.
  • Encourage teamwork, effective communication, and cooperation among technicians, engineers, contractors, and other site personnel.
  • Identify opportunities to improve commissioning work methods, testing efficiency, equipment reliability, and site productivity.
  • Provide feedback to Commissioning Engineers and management regarding recurring technical issues, installation concerns, and potential process improvements.
  • Perform other duties and responsibilities as assigned by the Commissioning Engineer, Commissioning Manager, or management.

Job Requirements

Educational Qualifications

  • Diploma, NITEC, Higher NITEC, or equivalent technical qualification in Mechanical, Electrical, Chemical, Mechatronics, Automation, or a related Engineering discipline.
  • Candidates with relevant technical certification and substantial hands-on commissioning experience may also be considered.

Professional Experience

  • Minimum5–7 years of relevant experience in equipment installation, testing, commissioning, maintenance, or related technical activities within the semiconductor, chemical, pharmaceutical, or process industries.
  • At least 2–3 years of experience in a supervisory or team-leading capacity would be advantageous.
  • Prior experience with chemical dispensing systems, chemical delivery equipment, process piping, or semiconductor manufacturing equipment is preferred.
  • Experience working at semiconductor fabrication facilities for end users such as Micron, GlobalFoundries, Siltronic, or equivalent organizations would be advantageous.
  • Demonstrated experience supervising technicians, coordinating daily site activities, and supporting equipment commissioning and testing.
  • Familiarity with semiconductor site safety practices, permit requirements, and customer inspection procedures.