TILES SETTER

AR GLOBAL CONSTRUCTION PTE. LTD.Singaporemycareersfutureközzétéve: 2026. 11. 10.

1)Align and straighten tile using levels, squares, and straight edges.

2)

Determine and implement the best layout to achieve a desiredpattern.

3)

Cut and shape tile to fit around obstacles and into odd spacesand corners, using hand and power cutting tools.

4)

Finish and dress the joints and wipe excess grout from betweentiles, using a damp sponge.

5)

Apply mortar to the tile back, position the tile, and press ortap with the trowel handle to affix the tile to the base.

6)

Mix, apply, and spread plaster, concrete, mortar, cement,mastic, glue, or other adhesives to form a bed for the tiles, using a brush,trowel, and screed.

7)

Prepare cost and labor estimates based on calculations of timeand materials needed for the project.

8)

Measure and mark surfaces to be tiled, following blueprints.

9)

Level the concrete and allow it to dry.

10)

Build underbeds and install anchor bolts, wires, and brackets.

11)

Prepare surfaces for tiling by attaching lath or waterproofpaper, or by applying a cement mortar coat onto a metal screed