Sr. Manager - Data Center Pre-construction

SB EnergyLubbock, Texas, TexasJob.bofoilsithe 20/04/2026
Riachtanach:AISeniorHybrid

Do you want to work with high-caliber professionals in a dynamic and growing company? Are you entrepreneurial, hard-working, and collegial? Join us at SB Energy, a leading infrastructure company backed by SoftBank Group and Ares Infrastructure, pairing cutting-edge innovation with best-in-class execution. Our mission is to deliver reliable and secure data center and power infrastructure to strengthen America's future.

Founded in 2019, SB Energy is a SoftBank Group company headquartered in Redwood City, California. In 2026, SoftBank Group and OpenAI announced a $1 billion investment to support SB Energy as their leading development and execution partner for data center campuses, while Ares Infrastructure continues its long-standing support of the company's growth. SB Energy develops, builds, owns, and operates some of the largest and most technically advanced energy and data center infrastructure projects in the United States. Since its founding, the company has rapidly grown into a top-tier integrated platform with more than 3 gigawatts (GW) in operation and a multi-GW pipeline of energy and data center infrastructure nationwide.

SB Energy also leverages a strong culture of innovation to identify and integrate new technologies into its projects, including its AI-based digital platform, delivering energy infrastructure that is local, reliable, and matched to load. We are building the energy and infrastructure future—today.

Come join us in accelerating the energy and infrastructure transition!

Basic Function

This Owner Senior Manager will support the successful planning and execution of data center programs near Austin and Lubbock. Experience with critical infrastructure, and large-scale MEP (Mechanical, Electrical, and Plumbing) design and construction projects is necessary for this role. This is an excellent opportunity for someone with a foundational understanding of construction project management who is eager to grow their preconstruction experience.

Responsibilities

  • Coordinate multiple owner affiliates and consultants to pull a program together that consist of power generation, transmission, civil, DC design.
  • Assist in reviewing and interpreting technical documentation, including conceptual design documents.
  • Track project timelines, deliverables, and milestones using scheduling tools.
  • Assist with budget development, tracking, and validation.
  • Prepare regular status reports and support the team in presentations and meetings.
  • Help identify potential project risks and escalate issues to leadership as needed.

Qualifications/Requirements

  • Bachelor’s degree in a related field is preferred.
  • 6+ years of professional experience.
  • 2–5 years of experience in construction or engineering project support roles, preferably with exposure to data centers or large mechanical/electrical systems.
  • Basic understanding of Entitlements, Due Diligence, MEP systems, construction sequencing, and project coordination.
  • Proficiency with Microsoft Office and project management tools (e.g., MS Project, Smartsheet, or similar).
  • Strong communication, organizational, and problem-solving skills.

Location: On-site near Lubbock, Texas.

Base Pay - $140,000-$200K+

The pay range mentioned above is a guideline. We tailor each offer based on your unique skills, experience, location, and market benchmarks—while ensuring internal parity across our teams. In addition to competitive base pay, total compensation may include a discretionary annual bonus and a market-leading comprehensive health and wellness benefits package. Final details will be discussed during the later stages of the hiring process.

Our Health & Wellness Benefits

At SB Energy, we invest in our people and their families with benefits designed for flexibility, support, and peace of mind. Full-time employees enjoy:

  • 100% Company-Paid Medical, Dental & Vision (for employees and dependents)
  • 401(k) with Company Match
  • Generous Paid Time Off + 11 Paid Holidays
  • 12 Weeks Paid Parental Leave
  • Life, AD&D & Long-Term Disability Coverage
  • Flexible Spending Accounts (FSA) for Medical, Dependent Care, Transit & Parking (with company contributions)
  • Mental, Physical & Social Wellness Support (with company contributions)
  • Flexible Work Arrangements & Hybrid Office Setup Benefits
  • Monthly Reimbursement for Phone, Internet & Data
  • Optional Legal & Pet Insurance Plans
  • Device Purchase Support

At SB Energy, the success of our projects is driven by a desire to see our projects benefit as many people as possible. We work to serve local communities through volunteering, fundraising, and much more. For example, we’re proud to support access and opportunity in engineering and clean energy through impactful mentorship programs and workforce training. When you join SB Energy, you can become a part of these efforts, collaborating with team members who share a vision of building a better future now!

SB Energy is built on a foundation of collaboration and inclusion. We are proud to be an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, creed, gender, national origin, age, disability, veteran status, marital status, pregnancy, sex, gender expression or identity, sexual orientation, citizenship, or any other legally protected class.

To learn more about us, visit https://www.sbenergy.com.

#LI-ONSITE

#LI-AM1