Senior Cost Engineer

PT Ganesha Aggies JayaJakarta Barat, DKI Jakartaglintspublished 09/07/2026
Must-have:SAP

Project Details The Sekincau development is an energy generation and transmission project located on the island of Sumatra, Indonesia. The outline scope of work involves developing the three (3) Sekincau geothermal wellfields, two (2) power plants and overland transmission and subsea connection to Singapore island for the export of up to 700 MW of electricity. The Sekincau project has been separated into five (5) major sub-projects as follows:

  • Sekincau Wellfield Drilling Project
  • Sekincau Labuhan Balak Geothermal Power Plant and Infrastructure Project
  • Sekincau Kalibata Geothermal Power Plant and Infrastructure Project
  • Power Transmission Project
  • Power Subsea Connection Project.

Role Description: Performs cost engineering activities including estimating, cost control, and forecasting using advanced techniques such as range-based estimating and forecasting methodologies. Qualifications, Skills and Experience:

  1. Bachelor’s (S1) in Engineering, Quantity Surveying, Finance, or related field
  2. 7–10+ years in cost engineering / estimating / forecasting

Skills: Epci, Cost Management, Primavera P6, Budget Management, Project Management, Cost Estimation, Microsoft Excel, Microsoft Office, Power System, Geothermal, SAP, Budgeting, Cost Control, Oil and Gas