drywall installer

Leading Edge Drywall LtdSurrey, BCjobbankcapublished 09/14/2026

Education:

Secondary (high) school graduation certificate.

Tasks:

  • Apply successive coats of compound and sand seams and joints.
  • Apply, level and smooth coats of plaster.
  • Clean and prepare surfaces.
  • Cure freshly plastered surfaces.
  • Fabricate and install suspended metal ceiling grids and place in panels to form acoustical and coffered ceilings.
  • Fill joints, nail indentations, holes and cracks with joint compound using trowel and broad knife.
  • Finish corners and angles and create decorative designs in finish coat, if required.
  • Measure, cut, fit and install drywall sheets.
  • Mix plaster ingredients to desired consistency.
  • Mould and install ornamental plaster panels, cornices and trim.
  • Smooth out excess compound and allow coat to dry.
  • Spray acoustic or texture materials over walls and ceilings.
  • Tape over joints using taping machine and embed tape in compound.
  • Cut openings in lath for heating and ventilation piping, ducts and electrical outlets.
  • Install acoustic tile, hangers for suspended ceilings and metal studs for composition wallboard or lath.
  • Install corner beads and wire mesh around beams to which plaster is to be applied.
  • Prepare wall and ceiling layouts.
  • Work at heights, on scaffolding or swing stages.
  • Erect and install scaffolding, falsework and other working platforms.
  • Read and interpret blueprints, maps, drawings and specifications.

Employment terms options:

Evening.

Experience:

2 years to less than 3 years.

Employment terms options:

Morning. Day.