Quantity Surveyor – Engineer
Your tasks
Drawing Receipt & Review
- Review all registered tender/project documents, including RFPs, scope of work, BOQs, specifications, drawings, addenda, and clarifications. And confirm that the information received is complete.
- Compare drawings, BOQs, specifications, and scope requirements to identify discrepancies, omissions, overlaps, and conflicting information.
- Prepare Packages as per project scope and include all related specifications, drawings and BOQ items related.
- Identify and highlight all discrepancies found and Prepare clear tender queries/RFIs for missing or conflicting information and track responses affecting scope or quantities.
AutoCAD Drawing Preparation & Quality Control
- Perform quantity take-off from drawings and other contract documents for relevant landscape, hardscape, softscape, and associated MEP items.
- Analyze quantities, dimensions, levels, schedules, and project data using AutoCAD, Revit, Cost X, Excel, and other appropriate tools.
- Prepare, populate, and update BOQs with clear item descriptions, units, quantities, measurement breakdowns, and supporting references.
- Identify quantity variances, missing BOQ items, duplicated items, and inconsistencies between drawings, specifications, and BOQ.
QS Drawing Preparation Hardscape DWG – paving, kerbs, walls, steps, site furniture, structures, finishes, and other hardscape elements as per scope of work
Softscape and Irrigation DWG – trees, shrubs, groundcovers, planting areas, landscape zones, and other softscape elements as per scope of work
MEP DWG, where applicable – irrigation, drainage, lighting, electrical, or other relevant MEP/landscape services as per scope of work
- Review all received drawings and make sure files are clear and appropriate for quantity take-off.
- Prepare clear demarcation drawings identifying included and excluded areas, work limits, interfaces, package boundaries, and responsibility splits
- Ensure all activities are concluded in coordination with the technical lead of each trade.
Submission Preparation
- Prepare and compile tender quantity take-off sheets, complete BOQs, drawing mark-ups, demarcation drawings, and supporting quantity schedules.
- Check that BOQ descriptions, units, quantities, specifications, and drawing references are consistent and complete.
- Maintain revision control and an organized record of received, reviewed, and submitted documents.
- Verify that all required files, revisions, and supporting drawings are included before submission.
- Ensure that DWG files are properly named, arranged and indexed according to the project/document control requirements.
- Maintain an organized record of submitted drawings and revisions.
Requirements
Quantity Surveying - Landscape and Infrastructure Projects
- Minimum 5 - 8 years of experience in quantity surveying, estimation, and quantity take-off, preferably in landscape, infrastructure, civil, or construction projects.
- Strong proficiency in AutoCAD; Revit; Navis and Cost X (if applicable)
- Previous experience in landscape, civil, construction, or quantity surveying environments.
- Good understanding of CAD layers, blocks, hatches, line types, scales, and drawing standards.
- Strong attention to detail and accuracy.
- Ability to identify drawing discrepancies and missing information.
- Good organizational and file-management skills.
- Ability to work under tight tender/submission deadlines.
Other
20%
30%
30%
20%