CONSTRUCTION MANAGER
Your tasks
1. Construction Planning and Project Execution
- Develop construction methods, work sequences, and execution strategies in accordance with approved drawings and specifications.
- Prepare construction schedules, resource plans, manpower deployment, and equipment requirements.
- Coordinate daily, weekly, and monthly construction activities.
- Monitor progress against project milestones and implement recovery plans for delays.
- Ensure construction activities comply with contractual requirements, approved method statements, and inspection and test plans (ITPs).
2. Tunnel Boring Machine (TBM) Operations
- Oversee TBM excavation activities, including EPB, slurry, or hard-rock TBM operations, as applicable.
- Coordinate TBM launch, tunneling advance, breakthrough, and retrieval activities.
- Monitor TBM performance indicators, including advance rate, penetration rate, thrust force, torque, cutterhead pressure, and stoppages.
- Ensure proper coordination of segment erection, tail-void grouting, muck removal, and tunnel logistics.
- Monitor ground conditions, face pressure, settlement, groundwater inflow, and potential risks during excavation.
- Coordinate TBM maintenance, cutter changes, consumables, and critical spare parts with the TBM team.
3. NATM/SEM and Conventional Tunneling
- Supervise excavation sequences, including top heading, bench, and invert construction, where applicable.
- Ensure timely installation of initial support, such as shotcrete, rock bolts, steel ribs, lattice girders, and wire mesh.
- Review geological conditions, rock mass classifications, and tunnel face mapping with the engineering and geotechnical teams.
- Ensure excavation rounds, support installation, and monitoring comply with the approved excavation and support design.
- Coordinate probe drilling, pre-grouting, dewatering, and water-ingress control measures where required.
4. Tunnel Lining and Civil Works
- Manage precast segment installation and quality control for TBM-driven tunnels.
- Supervise secondary lining, waterproofing membranes, reinforcement, formwork, and concrete placement.
- Coordinate invert slabs, cross passages, adits, shafts, portals, and underground structures.
- Ensure concrete quality, segment tolerances, gasket installation, bolt tightening, and watertightness requirements are met.
- Coordinate civil, mechanical, electrical, ventilation, drainage, and fire-life-safety interfaces.
5. Safety, Health and Environmental Management
- Implement the project safety management plan and ensure compliance with applicable legislation and client requirements.
- Conduct site inspections, toolbox meetings, safety briefings, and risk assessments.
- Ensure permits to work, confined-space controls, gas monitoring, ventilation, and emergency arrangements are in place.
- Control risks associated with underground work, including fire, flooding, ground collapse, hazardous atmospheres, and equipment movement.
- Investigate incidents and near misses, implement corrective actions, and monitor closure.
- Manage noise, dust, slurry, groundwater discharge, spoil disposal, and other environmental impacts.
6. Quality Assurance and Quality Control (QA/QC)
- Ensure construction work complies with approved drawings, specifications, ITPs, and quality procedures.
- Coordinate inspections, material testing, concrete testing, segment inspections, and survey checks.
- Review non-conformance reports (NCRs), corrective actions, and preventive measures.
- Ensure accurate records of excavation, support installation, grouting, lining, and as-built information.
- Coordinate inspections and approvals with the consultant, resident engineer, client, and relevant authorities.
7. Geotechnical Monitoring and Ground Settlement Control
- Coordinate monitoring of surface settlement, buildings, utilities, groundwater, and tunnel convergence.
- Review instrumentation data, including settlement markers, inclinometers, piezometers, and convergence points, as applicable.
- Ensure monitoring trigger levels and action plans are implemented.
- Coordinate immediate responses when monitoring results exceed alert or action limits.
- Work with geotechnical engineers to assess ground conditions and implement mitigation measures, including grouting or changes to excavation procedures.
8. Manpower, Equipment and Resource Management
- Plan manpower requirements for engineers, supervisors, surveyors, operators, and skilled workers.
- Allocate plant and equipment according to construction priorities.
- Coordinate shift work and 24-hour tunneling operations, including shift handovers.
- Monitor labor productivity, equipment utilization, and material consumption.
- Resolve manpower shortages, equipment breakdowns, and logistical constraints.
9. Cost Control and Commercial Management
- Monitor construction expenditure against the approved budget.
- Track productivity, quantities completed, material consumption, and subcontractor performance.
- Identify potential variations, additional works, and delay-related costs.
- Coordinate with the commercial and quantity surveying teams on progress claims, variations, and extension-of-time submissions.
- Minimize waste, rework, unnecessary stoppages, and inefficient resource utilization.
10. Coordination and Stakeholder Management
- Lead coordination meetings with project engineers, site supervisors, subcontractors, consultants, and the client.
- Coordinate interfaces between tunneling, shafts, stations, utilities, and associated civil works.
- Resolve technical and construction issues and escalate critical risks promptly.
- Coordinate permits, inspections, traffic management, utility protection, and authority requirements.
- Maintain effective communication between site teams, design teams, project management, and head office.
11. Progress Reporting and Documentation
- Prepare daily, weekly, and monthly construction progress reports.
- Track tunnel advance, excavation quantities, lining completion, labor productivity, and equipment downtime.
- Maintain records of TBM performance, geological conditions, stoppages, and ground movement.
- Report construction risks, delays, mitigation measures, and forecast completion dates.
- Maintain accurate site diaries, progress photographs, inspection records, and handover documentation.