Lead Mechanical Commissioning Engineer (Data Center Construction Experience)

InPwr IncIndianapolisJob.boδημοσιεύθηκε 09/02/2026
Απαραίτητα:QA/TestLead

InPwr, Inc. is looking for a seasonedLeadMechanical Commissioning Engineerto join our dynamic team!

We are an award-winning electrical design-build firm headquartered in Indianapolis, Indiana, with offices in Columbus, Indiana; Charlotte, North Carolina; Denver, Colorado; Monterey Park, California; Grand Prairie, Texas; and Fort Myers, Florida.

Recognized as a Top Place to Work in2019, 2022, 2023, 2024, and 2026, we are committed to building it better, pursuing complex opportunities, and taking electrical design to the next level. With licenses in more than 40 states, we proudly deliver projects across the nation.

We InPwr through personal commitment, relentless dedication, and driving results together.

Come join our team!

Skills and Requirements:

  • Certificates and Knowledge
  • Bachelor of Science of Mechanical Engineering.
  • HVAC, CRAC, AHU, ACCU, others
  • OSHA 10
  • Complete all Safety Certifications
  • Script development for L2-L5
  • Daily Reports
  • Knowledge of CAD, Bluebeam, and others
  • Ability to work directly on site, and ability to travel required 75%

Benefits:

  • Medical, Dental, Vision and Life Insurance 100% company paid for employees
  • Paid vacation & holidays
  • 401(k) company match
  • 30-day paid sabbatical every 5 years of employment
  • Stable employment with a growing company
  • Highly competitive salary

A Mechanical Commissioning Engineering role involves overseeing the installation, testing, and verification of mechanical systems and equipment to ensure they are functioning correctly and meet design specifications before they are put into operation.

Essential Functions:

  • Planning and Coordination:Participate in the planning and coordination of commissioning activities, working closely with project managers, design engineers, construction teams, and other stakeholders to ensure that commissioning activities are properly scheduled and executed.
  • Installation Verification:Verify that mechanical systems and equipment are installed according to design specifications, manufacturer's recommendations, and applicable codes and standards. This involves reviewing installation drawings, conducting site inspections, and ensuring proper alignment, assembly, and connections.
  • Functional Testing:Perform functional tests on mechanical systems and equipment to ensure they operate as intended. This may include testing components such as pumps, motors, valves, actuators, HVAC systems, plumbing fixtures, and other mechanical devices to verify their performance and functionality.
  • Performance Testing:Conduct performance tests to verify that mechanical systems meet performance requirements under normal operating conditions as well as during peak loads or other demanding scenarios. This may involve testing parameters such as flow rates, temperatures, pressures, vibration levels, and energy efficiency.
  • Documentation:Document all aspects of the commissioning process, including test procedures, test results, equipment specifications, and any modifications or adjustments made during commissioning. Accurate documentation is essential for compliance, future reference, and handover to operations and maintenance teams.
  • Training:Provide training to operations and maintenance personnel on the proper operation and maintenance of mechanical systems and equipment. This helps ensure that personnel are familiar with the systems they will be responsible for operating and maintaining.
  • Safety Compliance:Ensure that all commissioning activities are conducted in compliance with applicable safety regulations and standards to protect personnel and property. This includes implementing safety procedures, conducting risk assessments, and providing appropriate personal protective equipment (PPE) as needed.
  • Commissioning Reports:Finally, they compile commissioning reports summarizing the results of the commissioning process, documenting any issues or deficiencies identified, and providing recommendations for corrective actions or further optimization.
  • The role requires a strong foundation in mechanical engineering principles (BSME), practical experience with electrical systems and equipment, excellent problem-solving skills, attention to detail, and the ability to work effectively in multidisciplinary teams.

Other essential functions:

  • Travel required to different sites. 75% of travel required.
  • Perform a Daily report on site.
  • Be professional in all aspects.
  • Communicate professional to the GC, EC, and Owner
  • Oversees meetings, schedules, and testing.
  • Lead the Mechanical job and perform a daily meeting with Owner, GC, EC and others.
  • Mechanical team lead on site.
  • Responsible for expense reports and following company policies.
  • Oversees the QA/QC and commissioning on their area of work.
  • Able to create the Final Building report in conjunction with ECx, MCx and FLS.
  • Strong Organizational and documentational.

Working/ Environment/ Physical Demands tosuccessfully perform the essential functions of this job:

  • Job Requires working in all elements, depending on job location, time of year.
  • Must be able to utilize construction site sanitary facilities.
  • Work in restricted areas.
  • Wear personal protective equipment (hard hat, safety glasses always), respirator when required.
  • Able to work 8-10 hours per day, 40-50 hours per week.

Equal Employment Opportunity & Hiring Requirements

InPwr, Inc. is an Equal Opportunity Employer and a Drug-Free Workplace committed to maintaining a safe, inclusive, and discrimination-free work environment. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, veteran status, or any other status protected by applicable law.

Employment is contingent upon successful completion of the company's hiring process, which includes drug and alcohol screening, E-Verify, driving record verification, and a background investigation. InPwr, Inc. maintains a smoke-free and drug-free workplace in accordance with applicable federal law.

InPwr, Inc. is not currently hiring individuals for this position who now or in the future require employment visa sponsorship.

Visit us at www.inpwrinc.com to apply online!