Electrical Project Manager of Commissioning (Data Center Construction Experience)

InPwr IncIndianapolisJob.boκαταχωρημένη εδώ και 25 ημέρες

InPwr, Inc. is looking for a seasonedProject Manager of Commissioning to join our dynamic team!

We are an award-winning electrical design-build firm headquartered in Indianapolis, Indiana, with offices in Columbus, Indiana; Charlotte, North Carolina; Denver, Colorado; Monterey Park, California; Grand Prairie, Texas; and Fort Myers, Florida.

Recognized as a Top Place to Work in2019, 2022, 2023, 2024, and 2026, we are committed to building it better, pursuing complex opportunities, and taking electrical design to the next level. With licenses in more than 40 states, we proudly deliver projects across the nation.

We InPwr through personal commitment, relentless dedication, and driving results together.

Come join our team!

Skills and Requirements:

  • Certificates and Knowledge
  • Bachelor or similar
  • Master’s degree of Administrator (MBA) - optional
  • 3-5 years of experience
  • HV Substations, MV SWGR, LV SWGR, Busway, UPS, Generator, PDU, RPP, others
  • NFPA 70E
  • OSHA 10
  • Complete all Safety Certifications
  • Daily Reports
  • Knowledge of CAD, Bluebeam, and others.
  • Ability to travel and work on site 75% required.

Benefits:

  • Medical, Dental, Vision and Life Insurance 100% company paid for employees
  • Paid vacation & holidays
  • 401(k) company match
  • 30-day paid sabbatical every 5 years of employment
  • Stable employment with a growing company
  • Highly competitive salary

Project Manager specializing in Commissioning oversees the planning, scheduling, change order, proposal, coordination, and execution of commissioning activities to ensure that the data center's critical infrastructure operates reliably and efficiently. To ensure that we meet the Owner Project Requirements (OPR) and adhere to the Building of Design (BOD) to fulfill the owner's specifications, expectations, and any other requirements.

Essential Functions:

  • Project Planning:The Project Manager leads the development of the commissioning plan, which outlines the scope, schedule, resources, and procedures for commissioning the data center's infrastructure. This involves collaborating with stakeholders, including design engineers, construction teams, and facility operators.
  • Coordination:Coordinate commissioning activities with various project stakeholders to ensure alignment with project milestones and deadlines. This includes scheduling equipment installations, testing, and integration activities to minimize disruption to the project timeline.
  • Vendor Management:Liaises with equipment vendors and subcontractors involved in commissioning activities, ensuring that equipment is delivered on time, installed correctly, and tested according to specifications.
  • System Integration:Oversee the integration of various data center systems, including electrical, mechanical, fire suppression, security, and environmental monitoring systems. This involves testing interoperability, communication protocols, and failover mechanisms to ensure seamless operation.
  • Testing and Verification:Oversees the execution of functional and performance tests on critical infrastructure components, such as power distribution systems, cooling systems, UPS (Uninterruptible Power Supply) systems, generators, and data center management software. They ensure that systems meet design specifications and performance requirements.
  • Documentation:Maintain accurate records of commissioning activities, including test procedures, test results, equipment specifications, and as-built documentation. This documentation serves as a reference for future maintenance, troubleshooting, and expansion of the data center facility.
  • Risk Management:Identifies and mitigates risks associated with commissioning activities, such as equipment failures, system vulnerabilities, and operational disruptions. They develop contingency plans and escalation procedures to address unforeseen challenges.
  • Quality Assurance:Enforce quality standards throughout the commissioning process, ensuring that workmanship meets industry best practices and regulatory requirements. This includes conducting inspections, audits, and reviews to identify and rectify deficiencies.
  • Client Communication:Provides regular updates to the client or project stakeholders on the progress of commissioning activities, including milestones achieved, issues encountered, and resolution plans. They address client concerns and requests in a timely and professional manner.
  • Training and Handover:Facilitates training sessions for data center operations staff on the use and maintenance of critical infrastructure systems. Ensure a smooth handover of the facility to the client upon completion of commissioning activities, including documentation turnover and final acceptance procedures.

Other essential functions:

  • Travel required to different sites. 75% of travel required.
  • Perform a Daily report on site.
  • Be professional in all aspects.
  • Communicate professional to the GC, EC, and Owner
  • Oversees meetings, schedules, and testing.
  • Able to create the Final Building report in conjunction with ECx, MCx and FLS.
  • Responsible for expense reports and following company policies.
  • Strong Organizational and documentational

Working/ Environment/ Physical Demands tosuccessfully perform the essential functions of this job:

  • Job Requires working in all elements, depending on job location, time of year.
  • Must be able to utilize construction site sanitary facilities.
  • Work in restricted areas.
  • Wear personal protective equipment (hard hat, safety glasses always), respirator when required.
  • Able to work 8-10 hours per day, 40-50 hours per week.

Equal Employment Opportunity & Hiring Requirements

InPwr, Inc. is an Equal Opportunity Employer and a Drug-Free Workplace committed to maintaining a safe, inclusive, and discrimination-free work environment. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, veteran status, or any other status protected by applicable law.

Employment is contingent upon successful completion of the company's hiring process, which includes drug and alcohol screening, E-Verify, driving record verification, and a background investigation. InPwr, Inc. maintains a smoke-free and drug-free workplace in accordance with applicable federal law.

InPwr, Inc. is not currently hiring individuals for this position who now or in the future require employment visa sponsorship.

Visit us at www.inpwrinc.com to apply online!